DOMESTIC WASTEWATER TREATMENT SYSTEM IN MUSASHI PLANT, 42M3 CAPACITY. DAY AND NIGHT
Figure 1: Mushshi Plant
Figure 2: Lifting and lowering tank in installation site, anchoring cable and pumping water for fixing tank.
Figure 3: Work completed and operated
Figure 4: System of contral cabinet and gas blower machine
Figure 5.1: Moving Bed Biofilm Reactor MBBR1
Figure 5.2: Moving Bed Biofilm Reactor MBBR2
Figure 6: Taking after-treatment water sample